Manufacturing (Dental)
The Project
Our manufacturing client needed their laboratory space updating whilst still maintaining production levels at the same time. As a result, our team had to ensure a very clean working environment at all times working side-by-side with the production team.
The Space
Based within units at The Valley Centre the laboratory was on the ground floor. 4,520 square feet.
The Services
Strip Out, Builders Works, Structural Works, Carpentry, Tape and Jointing, Glass Partitioning, Doors, Suspended Ceilings, Plumbing, Painting, Flooring.